Our Building department is here to provide assistance with all of your Permitting needs.
Application for permits are done through our online permitting site Accela Citizen Access (ACA): https://ca.rcid.org/CitizenAccess. With ACA, an applicant can easily complete permit application forms, pay fees, track the application approval process, schedule inspections and request various forms of occupancy. Please see the links below to find information on applying for a building permit, or to view our permitting fees.
Forms
- Application for Permit
- Application for Permit - Design Professional
- Application - Valuation Verification
- Address Assignment Request Link
- Change of Architect/Engineer
- Change of Contractor/Qualifier
- Elevator Accident Form
- Elevator Affidavit of Code Compliance
- Elevator Hydraulic Valve Replacement
- Elevator Plan Review Checklist
- Master Plan Affidavit
- Narrative Slip
- Permit Release Authorization
- Permitting Authorization - Agent
- Permitting Authorization - Power of Attorney
- Registration – Licensed Contractors
- Registration – Non-Florida, Non-Licensed Required
- Registration – Non-Florida, Non-Licensed Required Temporary Event Only
- Registration – State of Florida, Non-Licensed Required
Service Call Technician Inspections
Policies
- Alternative Materials Methods Requirements
- Certificate of Occupancy / TCO Issuance Requirements
- Construction Documents Submittal Requirements
- Digital Seal and Signature Regulations
- Elevator Incident Form Upload User Guide
- Elevator Temporary Operating Permit Request User Guide
- Fee Schedule
- Fire Suppression Permit Requirements
- Food and Merchandise Carts/Kiosks/Mobile
- Inspection Requests Outside Normal Hours
- IVR User Guide
- Manufactured Building Requirements
- Master Plan Process Policy
- Permit Application Time Limit Policy
- Permit Issuance User Guide
- Potable Water Inspection Requirements
- Project Management / Out of State Q&A
- Remote Re-inspections
- Renewal of Expired Permits Requirements
- Swimming Pool Permit Requirements
- Temporary Gas Heaters
- Temporary Structures/Special Events
- Tuesday/Thursday Critical Inspection Review
- Umbrella Permit Policy